Level 3 Design Group renovates Marriott Ventura Beach

Level 3 Design Group renovates Marriott Ventura Beach.
The design team wanted to make sure that the topography and culture of Ventura Beach was incorporated into the property's new look. Photo credit: Level 3 Design Group

The renovation of the Marriott Ventura Beach is almost complete, with Level 3 Design Group putting the final touches on the 286 guestrooms, lobby, reception area, public corridors, great room, common areas, meeting spaces, M lounge and ballrooms. 

According to Eduardo Renteria, senior interior designer at Level 3 who oversaw the renovation of the property, the design team wanted to make sure that the topography and culture of Ventura Beach was incorporated into the design. The team used greys, blues, yellows and hints of purple to capture the surf town vibe and feel of Ventura Beach.

The Marriott Ventura Beach first opened in 1986.

FREE HOTEL MANAGEMENT NEWSLETTER

Like this story? Subscribe to Hotel Design!

Hospitality professionals turn to Hotel Design as their go-to news source for the latest products, projects, and trends for hotel interior designers and architects. Sign up today to get news and updates delivered to your inbox and read on the go.

Level 3 Design Group was founded in 1995.

Suggested Articles

Co-living brand The Collective has agreed a new £140m financing package from Deutsche Bank and GCP Asset Backed Income Fund.

Accor said that it could see room to grow in Europe, commenting that it would “never be number one” in North America and China.

Radisson Hotel Group has signed the Radisson Riyadh Airport in the Kingdom of Saudi Arabia.